Skip to content
БОТГЕРЦ
Language RU EN 中文

Vehicle manufacturers

Serial installation on the assembly line

How to take UVEOS into series production: acoustic tests, homologation and delivery to the plant schedule without stopping the assembly line.

1–5 days
acoustic tests
3 years
warranty on the batch
0
assembly line stoppages due to supply

Task

What the client needed

The plant is putting a new model on the assembly line and must include UVEOS in the design documentation. The deadlines are tight: a shift in production costs more than the equipment itself.

Solution

What we did

We work in stages synchronised with the plant schedule:

  1. We agree the technical specification and the unit installation point.
  2. We carry out acoustic tests on our own bench within 1–5 days.
  3. We hand over the reports and help include the device in the design documentation.
  4. We ship batches to the production cycle — from stock, without waiting for manufacturing.

In parallel, we train the plant engineers in Bluetooth configuration: setup takes minutes and does not require a service cable.

Equipment

What we used

Request

Discuss a similar project

Tell us about your task — we will show how a similar case was solved and estimate the cost.

Direct contact:

+7 (499) 372-0671 +7 (916) 522-4553 support@bothertz.ru

Mon–Fri, 09:00–18:00 (MSK)

We will send it directly to the responsible manager — no internal forwarding.

We reply within one business day. We use the data only to prepare a quote.